Buyer guide
What to write in your RFQ, how we share specifications, and practical notes for importing any product from India. Spices and rice are shown as examples.
What to include in your RFQ
- Product and category number (RFQ code)
- Specification or technical parameters
- Quantity: trial, container or annual
- Packaging requirement
- Destination country and port
- Required delivery timeline
- Quality or grade expectation
- Private label: yes or no
- Required documents
- Target market or end use
Example RFQ
Turmeric finger, 2% max moisture, 20 MT (1 × 20ft), 25 kg PP bags, CIF Jebel Ali, UAE, delivery in November, private label: no
How we share specifications
Every quotation follows the same format, and fields are completed only with confirmed data:
- Product name
- Category
- Origin
- Form or variant
- Grade or quality
- Packaging
- MOQ
- HS code
- Shelf life, where applicable
- Lead time
- Incoterms
- Certifications and documents
- Availability
Example: Spices
Give the spice name, whole or ground form, pack size and destination port. Ask for moisture and mesh size if you grind. Food and labelling rules differ by country, so your importer of record should confirm them; HS chapter 09 is a starting point, not a customs ruling.
Example: Rice
Tell us the variety, for example 1121 basmati or sella, the grain length, broken percentage, moisture limit, bag size and destination port. Ask for a sample before you confirm a bulk order.
Specifications for other products are shared on request with your RFQ.
Container load calculator
Pick a product and pack size, then enter the net weight you plan to load in one container.
Approximate number of bags/cartons: —
Approximate, confirmed in quote. Weight limits depend on the container, the shipping line and road rules at destination.
Order-to-dispatch timeline
Pick a category. Day 0 is the day your order is confirmed.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionFSSAI, ISO or SGS route, as applicable
- Loading20ft / 40ft FCL, mixed or dedicated
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–45 days after order confirmation
- InspectionMill test certificate, ISO or third-party inspection
- Loading20ft / 40ft FCL, by weight or volume
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionISO and destination electrical rules, as applicable
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionISO or buyer QC protocol
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing12–25 days after order confirmation
- InspectionISO, with food-contact tests where required
- Loading20ft / 40ft FCL or 40HQ
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionCompostability and food-contact documents, as specified
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionFibre and paper specifications on request
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionFSSAI or AYUSH route where applicable, with a batch COA
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing7–21 days after order confirmation
- InspectionFSSAI, ASTA, SGS or steam sterilisation, as specified
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–40 days after order confirmation
- InspectionISO, GOTS or OEKO-TEX route, if specified
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionBuyer QC, with nickel-release tests if specified
- LoadingLCL or 20ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–35 days after order confirmation
- InspectionISO, with colourfastness tests as specified
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–40 days after order confirmation
- InspectionISO and destination hygiene rules
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–35 days after order confirmation
- InspectionISO, with annealing and laboratory specifications as required
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packingSubject to the catch and processing window
- InspectionEIA, HACCP, BRC or SGS, as specified
- LoadingReefer container, 20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–40 days after order confirmation
- InspectionBuyer specification; type approval where the supplied model carries it
- LoadingLCL or 20ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packingSubject to licence and grade
- InspectionGMP and COA; licensed buyers only
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionISO, with food-contact tests if specified
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionISO, SDS and colour standards
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing12–25 days after order confirmation
- InspectionSDS, ISO and private-label brief
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–35 days after order confirmation
- InspectionBuyer QC; timber rules as applicable
- LoadingLCL, 20ft or 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–25 days after order confirmation
- InspectionISO and hygiene-market rules
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionStrain and count COA, as specified
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing30–75 days after order confirmation
- InspectionFAT, with third-party inspection if specified
- Loading20ft / 40ft FCL or break-bulk
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–35 days after order confirmation
- InspectionDimensional and material certificates, as specified
- LoadingLCL, 20ft or 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionFSSAI, ISO or COSMOS route, if specified
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–35 days after order confirmation
- InspectionISO, with sports-federation specifications if required
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–35 days after order confirmation
- InspectionEN71, ASTM and destination toy rules
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing20–40 days after order confirmation
- InspectionBuyer QC on finish and tuning grade
- LoadingLCL or 20ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Production and packing15–30 days after order confirmation
- InspectionSortex, SGS or buyer specification, as contracted
- Loading20ft / 40ft FCL
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
- Order confirmedDay 0. Specification, packing and price are fixed.
- Sourcing and supplier confirmationConfirmed in the quote.
- InspectionConfirmed in the quote.
- LoadingConfirmed in the quote.
- Shipping documentsThe commercial and shipping set is prepared for your lane and sent to you.
Lead times are indicative and confirmed per order.
Shipping document checklist
Pick your region and product type to see the standard export documents.
Destination region:
- Commercial invoice
- Packing list
- Bill of lading (sea) or air waybill (air)
- Certificate of origin
- Certificate of origin attested by a chamber of commerce. Some countries also ask for legalisation.
- Insurance certificate, for CIF shipments
- Phytosanitary certificate for plant products such as spices and rice
- Health certificate, where the destination asks for it
- Certificate of analysis
- Fumigation certificate, where required
- Seafood: health certificate from the Export Inspection Council (EIC) for an approved processing plant, where required
- Spices: Spices Board of India export requirements, including a quality test for some spices and markets
- Safety data sheet (SDS/MSDS)
- Dangerous goods declaration, if the goods are classed as hazardous
- Organic certificate, only if the goods are sold as organic
- Import permit or product registration in the destination country, where required
- Wooden pallets or crates: ISPM 15 heat treatment or fumigation, with the IPPC mark
- Toy safety test report to the destination standard, for example EN 71 (EU) or ASTM F963 (USA)
- The importer needs an EORI number to clear the goods
- United States: ISF filing for sea freight, done by the importer before loading
- United States: FDA prior notice for food, filed by the importer or their agent
- Saudi Arabia: SABER certificate for regulated products
- Some countries need a pre-shipment inspection certificate, for example Kenya (PVoC) or Nigeria (SONCAP)
- Australia and New Zealand: packing declaration and treatment certificate for wooden packaging
- Preferential certificate of origin, if your country has a trade agreement with India and you claim lower duty
Exact requirements are confirmed per order.